Minimize rig time and reduce flaring

Minimize rig time and reduce flaring

Some special efforts in well test design and operations can be pursued to minimize rig time and reduce flaring. Flaring less volume and for a less amount of time is not only good for safety and environmental reasons, but also cost effective.
However, any effort to minimize rig time and flared volume should not compromise the quality of the data and the reservoir subsurface objectives. We should stay flexible and look for any extra value-adding opportunities at minimum cost.
well test flaring
Most of the well tests are still designed and performed with some old techniques in mind. These techniques can clearly be challenged when applying the latest tools (deconvolution, new pressure gauges, etc…) and techniques.

 

Pressure gauges:
We no longer need to withdraw large amount of reservoir fluid thanks to improved technology with quartz pressure gauges. Gauge noise and resolution are so small that we don’t need to flare as much to detect and collect small pressure changes during the PBUs. However, we still tend to design our test assuming old-fashioned mechanical gauges…

 

Design the flowing time and flared volume based on a certain level of depletion:
We tend to design well tests assuming a certain level of depletion P, which will be created from flaring an hydrocarbon volume V. We need to produce enough hydrocarbon to “make a dent” in the reservoir and obtain a level of depletion P greater than the measurement error and any possible fluid density change. 

 

Total compressibility can be written as Ct= ∆V / (V.P). Then we should flare an hydrocarbon volume: 
∆V = Ct.∆P.V
with ∆V the flared volume, ∆P the level of depletion (usually a couple of psi) and V the volume we want to prove. 

 

This technique is based on a certain volume to prove and may not apply for some well tests whose objective is not to investigate reservoir connectivity. In addition, it depends on the depletion ∆P, which might be difficult to recover with the actual test data, under transient period. 
This flared volume should be seen as a sort of maximum flared volume. 
We could help to challenge this design with new well testing techniques using the conventional and deconvolved derivative.

 

Guidelines on Design and Operations to achieve objectives and optimize the test
To decide on the duration of flow periods and PBUs, we must perform a design study using a well test software. In TestWells, we will be happy to do that for you. 
The well test should be designed considering a large range of reservoir and fluid properties, with particular attention to the very worst case scenario. If investigating reservoir connectivity is part of the well test objectives, then the conventional derivative should be used for this matter in the design study.
This should result in some conservative test duration with a minimum of 2 PBU tests, which should be agreed with management. 

 

In operations, with real-time learning and a plan-do-measure-learn process in place, the test can be managed to include any extra value at minimum cost and optimized using well testing tools and techniques (real-time deconvolution and analysis). 
Shut-in duration would be dictated by cost constraints and by some target value of the radius of investigation. However, with access to real-time data, and provided 2 PBU tests, deconvolution can be investigated and used to shorten the 2nd PBU test.
It is worth noting that the shut-in duration needs to be long enough to see past the wellbore storage effect and to contain enough information for deconvolution to work.

 

The same design and analysis techniques can be applied on production wells.

 

Let us share with you some few other tips:

 

Removing the deliverability test
While this type of test is still recommended by some companies, the only deliverability test that we see as worth doing is the flow-after-flow test, i.e. step changes in rate for gas wells to define the turbulence factor D in d/Mscf.
There shouldn’t be any need for other fancy deliverability tests, especially when a PBU analysis gives us all we need, i.e. permeability, skin, initial pressure, connected volume, etc…
If you don’t agree with us, we will be more than happy to discuss it with you.

 

Removing the initial flow and shut-in after perforation and before clean-up:
Initial flow that produces a very small volume followed by an initial shut-in could be removed from the test.
The main objective with this old technique is to obtain an initial pressure value. At this stage, the well hasn’t been cleaned up and some uncertainty remains on the fluid density below the gauge (especially after a very small drawdown).
As a result, the initial pressure value derived from this technique is associated with a large range of uncertainty, and probably won’t be too useful for pressure transient analysis (in some cases, the result may vary by more than 100 psi from the correct initial pressure).
Nowadays, a good estimate of initial pressure value can be obtained with MDT data and/or refined with deconvolution, provided 2 PBU tests.
Again, if you disagree, let’s chat ! 
 
For more information, please select one of the links below. Or simply contact us.
Let’s find out how we can help you further at work:
Go to Well Test Support !
More on the theory and practices in the library in the learning centre. To access the library, you need to join the Well Testing Group.
Join the Well Testing Group ! Already a member, send me to the library !